Vertical Integration, Engineered Transparency

13,000㎡ manufacturing facility. Own metal hardware factory since 2007. Listed enterprise with 500,000+ annual unit capacity.

20+ Years Export Experience Guangzhou Equity Exchange Listed 80+ Skilled Workers
13,000+
Square Meters Facility
80+
Skilled Workers
500K+
Annual Capacity (Sets)
2007
Hardware Factory Established
Tengova factory complex exterior in Longjiang Foshan

Integrated Manufacturing Infrastructure

Located in Longjiang, Foshan—China's furniture manufacturing hub—our facility integrates metal hardware production and upholstery finishing under one roof. This vertical integration eliminates subcontractor variability and ensures structural integrity from frame to finish.

Our 13,000 square meter facility houses dedicated production zones for metal frame fabrication, foam processing, and final assembly. By controlling the entire production chain, we maintain consistent quality standards and predictable lead times for European and American B2B partners.

Steel Frame Production Upholstery Finishing In-House Hardware

Production Lines

Dual-stream manufacturing: in-house metal hardware fabrication and precision upholstery finishing

Robotic welding station creating metal furniture frames
Since 2007

Metal Hardware Factory

  • In-house metal frame production for sofas, sectionals, chairs, and table bases
  • Custom steel gauge specifications tailored to structural load requirements
  • Powder coating with customizable color and finish specifications
  • Structural reinforcement patterns engineered to product category
2019 Automation Upgrade

Automatic cutting machines and robotic welding stations implemented to increase precision and capacity while maintaining consistent weld quality.

Upholstery workshop with skilled workers
Precision Finishing

Upholstery Workshop

  • Foam cutting and shaping stations with CNC precision control
  • Leather and fabric upholstery cells organized by material type
  • Quality checkpoints integrated directly into line layout
  • Sample production capability: 1 piece minimum for custom orders
Quality Integration

Inspection stations positioned at critical transition points—foam-to-frame, fabric-to-foam, and final assembly—to catch variances before downstream processing.

Three-Tier Quality Control System

Systematic inspection protocols at every production stage—material verification through final shipment approval

Stage 1

Incoming Material Inspection

  • Raw steel gauge verification against specification sheets
  • Foam density testing for standards compliance
  • Leather grade authentication and batch consistency
  • Sintered stone and solid wood defect screening
Every Batch
Stage 2

In-Process Patrol Inspection

  • Welding seam integrity checks with visual and gauge verification
  • Frame dimension tolerance verification (±2mm standard)
  • Upholstery tension consistency across production run
  • Mid-production sampling at 15% batch rate
Every 2 Hours
Stage 3

Pre-Shipment Full Inspection

  • 100% finished product examination before packaging
  • Packaging integrity verification for transit protection
  • Loading configuration approval and container optimization
  • Documentation cross-check against order specifications
Every Container
Quality control inspector measuring furniture components with precision caliper

Company Evolution

Two decades of vertical integration and manufacturing advancement

2005

Export Operations Commence

Company founded in Longjiang, Foshan, establishing initial manufacturing partnerships and export channels to European and American markets.

2007

Strategic Vertical Integration

Own metal hardware factory established to control structural component quality and eliminate subcontractor variability in frame production.

2013

Portfolio Specialization

Strategic focus narrowed to living room and dining room furniture categories, enabling deeper engineering expertise and production efficiency.

2019

Automation Upgrade

Implementation of automatic cutting systems and robotic welding technology to increase precision, capacity, and consistency.

Present

Listed Enterprise Status

Official listing on Guangzhou Equity Exchange, providing enhanced governance transparency and financial accountability for B2B partners.

Current Status

Certification & Compliance

Guangzhou Equity Exchange
Listed Enterprise
EU Market Standards
Export Compliant
US Market Standards
Export Compliant

See the Engineering Behind the Product

Schedule a virtual facility tour or request sample evaluation. Our technical team will respond within 2 business days.

Or contact us directly for immediate assistance